BOIES SCHILLER FLEXNER (2019) San Francisco, CA


BOIS SCHILLER FLEXNER, San Francisco, CA (2019)BOIS SCHILLER FLEXNER, San Francisco, CA (2019)BOIS SCHILLER FLEXNER, San Francisco, CA (2019)BOIS SCHILLER FLEXNER, San Francisco, CA (2019)BOIS SCHILLER FLEXNER, San Francisco, CA (2019)

BOIES SCHILLER FLEXNER, San Francisco, CA (2019)

Progettista: SCHILLER Projects / Architetto
Installatore: NEWMAT Northeast Corp.

Progetto: 5 teli doppi NEW/LIGHT (circa 72 mq in totale) con il telo T0B/bianco traslucido installato su NMWGP-40X13 (profili perimetrali in PVC) a parete e retroilluminato da Apogee.