WASHINGTON UNIVERSITY (2006 – 2008) MO


WASHINGTON UNIVERSITY (2006 - 2008) ST. LOUIS, MOWASHINGTON UNIVERSITY (2006 - 2008) ST. LOUIS, MOWASHINGTON UNIVERSITY (2006 - 2008) ST. LOUIS, MOWASHINGTON UNIVERSITY (2006 - 2008) ST. LOUIS, MO

WASHINGTON UNIVERSITY LAW SCHOOL, St. Louis, MO (2006 – 2008)

Specifier: Mcclure Engineering / Designer
Installer: Golterman & Sabo, Inc.

Project: 270 custom fabricated ceiling panels (approximately 6,750 square feet total) with custom perimeter extrusion and T7/clear micro-perforated ceiling membranes installed under large skylight.

You Need to Log in to View the Shop Drawings