RIVER POINT, Chicago, Illinois (2015)
Specifier: Pickard Chilton Architects / Architect & Kendall/Heaton Associates / Architect
Installer: RG Construction Services, Inc.
Project: 112 NEW/CLASSIC ceilings (approximately 4,700 square feet total) using M15/white matte membranes with ceiling ghost acoustic perimeter profiles.