SALVATION ARMY CHAPEL, Washington, DC (2008)
Specifier: SmithGroup / Architect
Installer: NEWMAT USA LTD. / W. Babylon, NY
Project: 4 NEW/LIGHT double-layered cloud systems (approximately 2,000 square feet) using white translucent/T0B and Crystal/T7 color/finish membranes with Ghost Framing perimeter extrusion.
You Need to Log in to View the Shop Drawings
Login