U.C. BERKELEY (2012) CA


U.C. BERKELEY / STUDENT ATHLETE HIGH PERFORMANCE CENTER (2012) BERKELEY, CAU.C. BERKELEY / STUDENT ATHLETE HIGH PERFORMANCE CENTER (2012) BERKELEY, CAU.C. BERKELEY / STUDENT ATHLETE HIGH PERFORMANCE CENTER (2012) BERKELEY, CAU.C. BERKELEY / STUDENT ATHLETE HIGH PERFORMANCE CENTER (2012) BERKELEY, CA

UNIVERSITY OF CALIFORNIA AT BERKELEY / STUDENT ATHLETE HIGH PERFORMANCE CENTER, Berkeley, CA (2012)

Specifier: Studios Architect / Architect
Installer: Newmat Norcal

Project: 69 Luminous ceilings NEW/LIGHT double-layer panels (approximately 1,750 sq. ft. total) using T0B/white translucent membranes stretched with custom grid and 5 NEW/GRAPHIC acoustical wall panels (approximately 1,250 sq. ft. total) using ACM15/white matte micro-perforated membranes with custom graphics and stretched over Tectum acoustical core.